Data centers will start running on 800 VDC power as early as 2027
AI-generated summary Nvidia plans to require an 800 VDC power architecture beginning with its Rubin Ultra and Kyber rack architectures in 2027. This shift will result in lower-current and simpler power distribution that enables data centers to use the latest GPUs.